Skip to content
Guide

Morocco, Portugal or Asia: where to make your first collection?

Updated

For a first clothing collection in small quantities, delivered to Europe, Morocco is usually the right fit: test runs and small batches welcome, no strict minimum, and 20 to 29 days door to door. For leather sneakers, Portugal, from 100 pairs. For runs of 30,000 pieces or more, Asia, with our Sri Lanka hub. The right choice depends on three things: your quantity, your product and your launch date.

The comparison in one table

CriterionMorocco (Tangier–Tetouan)Portugal (Porto)Asia: our Sri Lanka hub (Colombo)
ProductsT-shirts and jersey, leather goods and accessories, upcyclingHand stitched leather sneakers and dress shoesWovens, knits and basics in high volume
Minimum orderNo strict minimum; best unit price from 300 pieces100 pairs30,000 pieces
Production18 to 24 days24 to 35 days32 to 45 days
Transport to Europe2 to 5 days, road and sea via Tanger Med and Algeciras48 to 72 hours, by road5 to 30 days, by sea or air
Total, door to door20 to 29 days26 to 38 days37 to 75 days
Customs duty and originDuty-free if the garment originates in Morocco and travels with a proof of origin; the origin of the fabric decidesNo import for a delivery within the EUDepends on the EU tariff and the arrangement that applies to the country of origin, to be checked for your code
Quality controlChecks on the line, final AQL 2.5 inspectionChecks on the line, final AQL 2.5 inspectionChecks on the line, final AQL 2.5 inspection
Ideal forFirst orders and fast replenishment into EuropeLeather footwear, from prototype to small batchesHigh volume runs of 30,000 pieces or more

In every hub: factories we quality-check ourselves, quality checks during production, on the line, and DAP door-to-door delivery (DDP on request).

Quantity: what decides first

A first collection is often a few hundred pieces, spread across several styles and sizes. In Morocco, test runs and small batches are welcome, with no strict minimum; the best unit price applies from 300 pieces. Under 300 pieces, a set-up fee is added, priced in the firm quote.

In Portugal, the minimum order is 100 pairs. Our Sri Lanka hub is built for high volume: the minimum order there is 30,000 pieces. It rarely suits a first collection.

Lead times: prototype, production, transport

In Morocco, a prototype takes 15 days. Production then takes 18 to 24 days, and transport to Europe 2 to 5 days, so 20 to 29 days in total, door to door. It is the fastest hub from end to end.

Portugal has the shortest transport, 48 to 72 hours by road, but a longer production: 26 to 38 days in total. Sri Lanka takes 37 to 75 days in total, depending on whether goods travel by sea or by air.

If your launch date is close, or if you want to restock what sells quickly, proximity matters more than anything.

Distance and transport

From Morocco, goods travel by road and sea, via Tanger Med and Algeciras. From Portugal, by road, across Europe. From Sri Lanka, by sea or air. In all three cases, we deliver DAP door to door: freight is arranged, and customs clearance is arranged on your behalf when there is an import. See our DAP or DDP guide.

Customs duty and origin

Morocco. A garment made in Morocco can enter the EU free of customs duty, but only if it originates within the meaning of the EU–Morocco rules of origin and travels with a proof of origin (EUR.1 or origin declaration). For a garment, the origin of the fabric decides: a fabric originating in the EU, or woven in the EU, allows it; a fabric from Asia, as a rule, does not. Everything is explained in our Morocco, EUR.1 and 0% duty guide.

Portugal. Portugal is in the EU. For a delivery within the EU, there is no import, so no customs clearance.

Asia. The EU import duty depends on the garment's country of origin and on the arrangement that applies: the normal EU tariff duty, or one of the arrangements of the EU Generalised Scheme of Preferences (standard GSP, GSP+, Everything But Arms), each with its own conditions and rules of origin. We do not give rates here: check it in Access2Markets or TARIC for your code and your country, with your customs broker.

Quality control

It is the same in all three hubs. We quality-check the factories ourselves, run quality checks during production, on the line, and before each shipment a final AQL 2.5 inspection, under ISO 2859-1 sampling.

Already producing in Asia?

If you keep your large volumes in Asia and are looking for a closer source for new styles, small batches and restocks, Morocco meets that need: no strict minimum, 20 to 29 days door to door. For very large runs, our Sri Lanka hub takes over from 30,000 pieces.

Before moving a style, look at where its fabric comes from: that is what decides whether the garment can enter the EU duty-free from Morocco.

Frequently asked questions

Where should I make my first clothing collection?

Most often in Morocco: test runs and small batches welcome, no strict minimum, best unit price from 300 pieces, and 20 to 29 days door to door to Europe.

Where should I make leather sneakers?

In Portugal, in Porto: hand stitched leather sneakers and dress shoes, from 100 pairs, in 26 to 38 days in total.

Which hub is the fastest to Europe?

Door to door, Morocco: 20 to 29 days. Portugal has the shortest transport, 48 to 72 hours, but a longer production: 26 to 38 days in total.

Does a garment made in Morocco always enter the EU duty-free?

No. It must originate within the meaning of the EU–Morocco rules of origin and travel with a proof of origin. The origin of the fabric usually decides. See our Morocco, EUR.1 and 0% duty guide.

When should I choose Asia?

For runs of 30,000 pieces or more, with our Sri Lanka hub, in 37 to 75 days in total. The import duty then depends on the country of origin and the applicable arrangement, to be checked for your code.

Next step

Compare our hubs in detail on the which hub to choose? page, or go straight to the Morocco, Portugal or Sri Lanka page. For an indicative price, use the quote simulator.

Have the duty question validated by your customs broker. This guide compares our hubs; it does not replace professional advice on your product and its origin.

Official sources

European Commission, DG Trade: EU Generalised Scheme of Preferences (GSP).

European Commission, Access2Markets: duties and rules by product and country.

EU tariff: TARIC.

Texts checked on 13 November 2026.

Our three hubs

  • Morocco · Tangier–Tetouan

    Clothing in premium fabrics, confection and upcycling. No strict minimum, best unit price from 300 pieces, 20 to 29 days in total.

  • Portugal · Porto

    Hand stitched leather sneakers and dress shoes. Minimum 100 pairs, 26 to 38 days in total.

  • Sri Lanka · Colombo

    High volume runs of wovens, knits and basics. Minimum 30,000 pieces, 37 to 75 days in total.

Not sure yet? Start with a quote

Pick a hub, a service and a volume in the simulator: you get an indicative DAP unit price and a delivery window, then a sourcing lead replies within one business day.