Skip to content
Morocco · Portugal · Sri Lanka

Which Manufacturing Hub to Choose?

Choose Morocco (Tangier–Tetouan) for clothing from 300 pieces, delivered in 20 to 29 days; Portugal (Porto) for leather sneakers and shoes from 100 pairs, in 26 to 38 days; Sri Lanka (Colombo) for runs of 30,000 pieces or more, in 37 to 75 days. All three hubs deliver door to door to Europe (DAP), after a final AQL 2.5 inspection.

The three hubs compared

MoroccoPortugalSri Lanka
Minimum order300 pieces100 pairs30,000 pieces
Production18 to 24 days24 to 35 days32 to 45 days
Transport to Europe2 to 5 days48 to 72 hours5 to 30 days
Total, door to door20 to 29 days26 to 38 days37 to 75 days
ProductsT-shirts, jeans and denim, outerwear, upcyclingHand stitched leather sneakers and dress shoesWovens, knits and basics in high volume
Transport modeRoad and sea, via Tanger Med and AlgecirasRoad, across EuropeSea or air
Final inspectionAQL 2.5AQL 2.5AQL 2.5
Ideal forFirst orders and fast replenishment into EuropeLeather footwear, from prototype to small batchesHigh volume runs of 30,000 pieces or more

In every hub: factories we quality-check ourselves, quality checks during production, on the line, and DAP door-to-door delivery (DDP on request).

Frequently asked questions

Which hub should I choose for a first order?

Morocco suits most first orders: production starts at 300 pieces and delivery to Europe takes 20 to 29 days in total, door to door.

Where should I make leather sneakers?

In Portugal, in Porto: hand stitched leather sneakers and dress shoes, from 100 pairs, in 26 to 38 days in total.

Which hub for 30,000 pieces or more?

Sri Lanka, in Colombo: large sewing floors for high volume runs of wovens, knits and basics, from 30,000 pieces, in 37 to 75 days in total.

Which hub is the fastest to Europe?

Door to door, Morocco is the fastest: 20 to 29 days. Portugal has the shortest transport, 48 to 72 hours, but a longer production: 26 to 38 days in total. Sri Lanka takes 37 to 75 days.

Is quality control the same in every hub?

Yes. In all three hubs, we quality-check the factories ourselves, run quality checks during production, on the line, and a final AQL 2.5 inspection before shipping. Delivery is DAP door to door by default; DDP is available on request.

See each hub

  • Morocco · Tangier–Tetouan

    Clothing in premium fabrics, confection and upcycling. Minimum 300 pieces, 20 to 29 days in total.

  • Portugal · Porto

    Hand stitched leather sneakers and dress shoes. Minimum 100 pairs, 26 to 38 days in total.

  • Sri Lanka · Colombo

    High volume runs of wovens, knits and basics. Minimum 30,000 pieces, 37 to 75 days in total.

Not sure yet? Start with a quote

Pick a hub, a service and a volume in the simulator: you get an indicative DAP unit price and a delivery window, then a sourcing lead replies within one business day.